Inside your sprint, not beside it
The first pull request arrives in days
Onboarding a Laravel developer is quick when the project has a working README, and revealing when it does not. On day one they clone the repository, build the environment with Sail or Docker, run the migrations and the test suite, and note every step that was missing from the docs. Their first pull request is often that corrected setup guide plus a small bug fix. It is a modest start on purpose. You see how they write commits, describe a change and respond to review before anything important depends on them.
By the end of week two
They should have shipped a handful of small stories and understand the core domain: the main models, how tenants or accounts are separated, which jobs run in the background and what the deployment pipeline does. Expect a short list of observations too. Typical entries are controllers doing work that belongs in jobs, missing indexes, or a scheduler entry that can overlap itself.
What a sprint with them looks like
They pick up stories from your board like anyone else on the team, ask questions in the ticket or your chat channel and keep work in small branches. A pull request from our developers includes the migration, the tests, a note on how to verify it and anything operations need to know, such as a new environment variable or queue. They review other people's pull requests if you want that. Estimates and blockers are raised early. The project manager compiles the report your engagement model calls for, so nobody on your side has to chase hours.
Migrations, deployments and other sharp edges
Most of the risk in Laravel work sits outside the features: a migration that locks a large table, a job that is not safe to retry, a cache key that leaks across tenants. Our developers write migrations that can be rolled back, split destructive schema changes across releases and test queued work with failure in mind. Production access is yours to grant or withhold.
Measuring fit after a month
Look at review comments. If your lead is correcting the same things in week four as in week one, the fit is wrong, and you should ask us for a replacement. If reviews have turned into short conversations about design choices, you have the right person. Teams that also need front-end capacity sometimes add a full-stack developer at that point.